Introductory text.
Constructed By: | |
---|---|
Owned By: | Oregon Railway & Navigation Company (1888–1896) |
Oregon Railroad & Navigation Company (1896–1910) | |
Oregon-Washington Railroad & Navigation Company (1910–1912) | |
Important Dates: | July 11, 1888 – Lower deck opened for steam trains |
February 15, 1889 – Top deck opened for teams and pedestrians as a toll bridge | |
November 1, 1889 – Streetcar tracks for the Albina line across top deck | |
July 31, 1912 – Last day of streetcar service over bridge | |
Date Closed: | August 9, 1912 |
Date Demolished: | September 13, 1912–March 27, 1913 |
Preceded By: | Railroad ferry over the Willamette River |
Succeeded By: | ‣ |